Why subdivision works take so much information
The works on a subdivision lay the foundation for everything that follows. The ground is excavated, levelled and prepared, the roads and sewerage are laid, and the green areas are planted. If this is not done according to the drawings and the permit, every home in the subdivision feels the consequences.
That is why the site crew has to work with the right version of the working drawing, the environmental permit must be in order before the works start, and every sewerage inspection certificate must be easy to find later, per home. Often a soil survey report and the insurance of the works belong to it as well.
With IRP in Lean ERP you record the works as a sequence of steps, with per step the information that belongs to it. Below is an example of such a step plan. You can model your own processes within IRP.