Why preparing a subdivision takes so much information
Before an excavator arrives on site, a lot has to be decided and recorded. Does something need to be demolished first? Which utility networks need to be extended, and which documents does each network operator ask for? What will the project cost in materials, labour, infrastructure and financing? And which subcontractor does the earthworks, under which contract?
Each answer comes from a different party: the contractor, the engineering firm, the network operator, the bank, the municipality. Those documents are needed again later, when the subdivision is carried out and the blocks are built. If one is missing, you often only notice when the next step has to start and the crew is already scheduled.
With IRP in Lean ERP you record the preparation as a sequence of steps, with per step the information that belongs to it. Below is an example of such a step plan. You can model your own processes within IRP.