Skip to content
Industries Construction companies

ERP for earthworks: crews, machines and sites in one system

Lean is ERP software for earthworks contractors, road builders and drainage firms. You plan crews, machines and lorries per site, record hours and consumption by phone, and follow up the estimate, progress claims and job costing per site.

What makes earthworks different

In earthworks the cost is in people and machines. An excavator standing idle or a lorry driving empty costs as much as a crew that waits.

Machines are your largest costCranes, excavators, lorries and rollers need to be on the right site, on the right day, with a driver.
Short, changing jobsBesides large sites there are many small jobs: a driveway, a connection, a trench. Each job still needs to be planned and invoiced.
The weather and the previous partyRain or a site that is not ready upsets the planning. You need to be able to move things quickly.
Documents per siteDrawings, permits and documents on removed soil belong to the site, not in a folder on the server.

Planning crews, machines and lorries

In Lean you do not only plan people. A crew, a machine or a lorry is a plannable resource with its own capacity. Per day you see what is where and how much room is left. If a site shifts, you drag the job to another day.

Jobs that are not yet planned are in a "to be planned" list. That way a small job does not slip through the net.

Hours and consumption from the site

The foreman or the machine operator records hours, materials and photos by phone, in the browser, without a separate app. That data goes straight into the site file, so the office does not have to wait for paper work orders.

Recorded work becomes lines to be invoiced. That way, on a small job, no hour is lost between the site and the invoice.

From estimate to job costing, per site

The estimate gives a selling price and a cost price per item. Once the quote is confirmed, it becomes the order in the same file, with a site budget per item. On large sites you make progress claims in instalments; extra work is included in the next claim.

Job costing shows the budget next to the actual figures: hours, machine use, materials and subcontractors. That way you see which type of work pays and where to adjust your price.

Documents and information per site step

With IRP you record per site step which information is needed: a drawing, a permit, a traffic management permit, the documents on removed soil. Per step you see what has come in, what is still missing, and who has to supply it. Which steps and documents your sites have, we set up together at the start.

Frequently asked questions about ERP for earthworks

Can I plan machines and lorries, not just people?

Yes. In Lean a machine or a lorry is a plannable resource with its own capacity, just like a crew.

Can machine operators enter their hours on site?

Yes. Hours, materials and photos are recorded by phone, in the browser, and go straight into the site file.

Does Lean also work for many small jobs?

Yes. Each job is a file with a work order. What is not yet planned is in the "to be planned" list, and recorded work becomes lines to be invoiced.

Bring one bottleneck. See how Lean handles it.

We start from a situation in your work. You see what works in the software today, and we discuss how it fits your process.

Book an online demo